PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

1) Formwork for Foundation Wall at Col Line 2.5.JPG 3) Slip Form Prep.JPG 2) Insulation at Elevators 5 - 6 awaiting slip forms (2).JPG 5) Ice on Site at Footing H1 (2).JPG 4) Formwork for Foundation Wall at Col Line 2.5 (2).JPG
Previous pageNext page 2) Insulation at Elevators 5 - 6 awaiting slip forms (2)
2) Insulation at Elevators 5 - 6 awaiting slip forms (2)